Incorporate the adjacent, 575 Charles Street property – a Chipping and Grinding Operation (2.94 acres) into the 625 Charles Street GreenWaste Material Recovery Facility (6.05 acres) to create a combined 8.99 acre material recovery facility.
-
Combine material handing operations from the two sites. Currently, GreenWaste Recovery Facility has a full Solid Waste Facility Permit (Facility No. 43-AN-0019) that allows material receipt of up to 2,000 tons per day (TPD). The adjacent GreenWaste Materials Recovery Facility (Facility No. 43-AN-0020) operates under an EA Notification that allows chipping and grinding of up to 200 TPD.
-
Increase the maximum daily incoming tonnage to 3,500 TPD (up from the current 2,200 TPD at both sites).
-
Allow the combined facilities to handle the following materials: municipal solid waste (MSW), mixed construction and demolition debris, recyclables, green waste, and compostable materials (organics/food waste).
-
Allow 24 hours per day, 7 days per week operating hours for both sites.