Provide more accurate maximum depth waste in Zones 1 and 4, which will not change the existing permitted airspace capacity, lowest base excavation elevation, or ultimate fill elevation; update the permit conditions and Joint Technical Document to reflect the separately permitted on-site Prima Deshecha Materials Recovery Facility.